  • Construction Project Manager
    Burns & Mcdonnell Jun 2021 - Present
    Kansas City, Mo, Us
  • Construction Engineering Manager
    Mcdermott International Inc. Dec 2018 - May 2021
    Houston, Texas, Us
    Primary Client technical contact on site. Sub Project Manager for Electrical SAT, Heavy Lift Engineering, Steam Blow, Chemical Cleaning, Hydro Material ($2m), and Vendor Rep Support ($2m). Manager for planning / work packaging, schedule reviews, piping test package creation, and all field problems including Electrical, Instruments, Piping, Mechanical, & Civil / Structural.• Achieved milestone bonus for Energization and DCS/RIE turnover by managing a team for Transformer Oil Filling, Power Control Room Site Acceptance Test (SAT), and DCS / Remote Instrument Enclosure (RIE) SAT subcontracts. • Managed Pre Commissioning work related to Aqualazing / Hydro milling, Steam Blowing, Chemical Cleaning, and Lube Oil Flushing. Achieved on time Client milestone Bonus of Ready for Steam Blow• Saved 30% in cost by creating 2,500 piping test packages in a low cost engineering center (first for CB&I division)Project: Ethane Cracker Project, BAYPORT POLYMERS LLC originally Total Petrochemicals & Refining USA, Inc., EPC, 1,000,000 MTPA, $1.3 Billion Lump Sum, 3.25 million man hours
  • Field Engineering Manager
    Mcdermott International Inc. Jan 2016 - Dec 2018
    Houston, Texas, Us
    Responsible for managing all field engineering activities and overseeing 12 field engineers. Activities include: early project constructability reviews and monitoring implementation, coordinating with engineering through Requests for Information (RFI’s), interfacing with the client through the technical queries (TQ’s), resolving unsatisfactory quality findings, developing technical scopes of work for subcontracts, managing site document control, developing requisition packages for permanent plant material, coordinating system turn over, and identifying changes and coordinating through the management of change process including assisting in the development of cost estimates. Construction site based in Westlake, LA.- Worked directly with Client on new change order scope to develop, execute, and manage subcontracts for pre-commissioning steam blow, pigging, & catalyst loading. Achieved the Client’s goal of on time start up by closely managing execution.- Identified 73,000 man hours of potential change orders resulting from RFI’s and engineering drawing changes- Completed Heavy Lift program (setting 50 pieces) 2 weeks early by closely managing the planning of work activities- Assisted in maintaining the forecasted on time completion by managing quick close out and impacts of 1,200+ RFI’s- Saved 10,000 field man hours by identifying and implementing a pre-cast concrete dike wall vs original cast-in-placeProject: LA MEG-1, Lotte Chemical Louisiana, LLC, EPC Consortium: MDR (Construction & Limited Procurement) & Samsung (Engineering & Procurement), 700-ktpa greenfield Ethylene Glycol Plant, $390+ million MDR Scope, 2.6 million man hours, Westlake, LAPurchase Orders Managed: ~$9.5m+ Fabricated Structural Steel (4,000 tons), ~$1.5m+ Rebar Fabrication, ~$450k+ Precast Concrete Columns Qty 80, ~$200k+ steel embeds for concrete, ~$100k+ Anchor Bolts, ~$700k+ precast concrete dike wall, ~$1.3m+ precast concrete trenches.
  • Mechanical Engineer
    Cb&I Jan 2014 - Jan 2016
    Houston, Texas, Us
    Managed the Project design, development of specifications, creation of data sheets, development of requisition packages, review of technical proposals, and issuing of technical evaluations for various pieces of mechanical equipment prior to final purchase order. Post award I was responsible for coordination with the selected supplier, review of vendor documents, ensuring delivery, and resolution of construction issues. Project: FLNG Liquefaction, LLC, lump sum, three train 4.6 MTPA liquefaction facility (LNG), including brown field regas conversion facility upgrades, and grassroots pretreatment facility. Project Location: Freeport, TX. - Responsible for design and requisition of LNG Marine loading arms package (US $3.5 million), Marine gangway (US $400k), Firewater pump package (US $500k), Standby generators (US $7.6 million), LNG In-tank Pumps (US $5-million), and Bridge cranes (US $4.6-million).- - On time delivery of 4 x 16” LNG Marine Loading Arms ($3.5m) through effective coordination (No change orders)- - No change orders & on time delivery of Firewater Pump Skid ($600k) by detailed scope development / managementProject: Elba Liquefaction, LLC, FEED Project for a conversion of an existing LNG Regasification Terminal to a Liquefaction plant for LNG export based on Shell's Modular Movable LNG System (MMLS) technology with a total capacity of 2.5 mpta. Project Location: Savannah, GA.- Responsible for developing specifications, data sheets, and requisition packages for Cryogenic truck loading arms, API 610 centrifugal pumps, ASME B73.1 pumps, Sump pumps, Demineralized water package, and CPI separator.Project: Ingleside Ethylene LLC, joint venture: OxyChem and Mexichem, S.A.B. de C.V, lump-sum, 520-ktpa grassroots ethylene plant, fractionation, OSBL utilities and storage project, Ingleside, TX.. - On time delivery with minor change orders for of Chemical injection skids (US $600k), Truck loading arms (US $100k), and Truck scale (US $60k)
  • Ctp - Project Engineer
    Cb&I Oct 2013 - Jan 2014
    Houston, Texas, Us
    Project: Blue Racer Natrium Gas Plant – Reimbursable – New Martinsville, WV• Managed technical and construction questions related to rebuilding the gas plant CB&I previously built after damage following a fire.• • Reduced fire evaluation time by 50% by efficiently locating or reproducing engineering information.
  • Ctp - Accounting Specialist (Corporate Finance Pec / Sps)
    Cb&I Feb 2013 - Oct 2013
    Houston, Texas, Us
    Aided in development of JDE specialty reports related to project data entry. Responsible for contract delay cost tracking and client invoicing resulting from fire damage at the client’s existing facility. Assisted with hybrid contract client invoicing (lump sum engineering/reimbursable construction). Including tracking client issues and short pays.Project: Williams Olefins, Geismar LA, Ethylene Upgrade 1.35 to 1.95 billion lb/yr.• Identified $5.8m in costs related to delays and suspension of work by analyzing data and capturing issues
  • Ctp - Field Engineer (Technical Services)
    Cb&I Mar 2012 - Feb 2013
    Houston, Texas, Us
    Project: Dominion Natrium Gas Plant - Lump-sum EPFC – New Martinsville, WV- Assisted Technical Services Manager and Construction management with construction and engineering clashes. - Supported communication between several subcontractors and engineering disciplines technically and in on-site planning. - Coordinated with the home office for field RFIs.
  • Ctp - Mechanical Engineer
    Cb&I Jun 2011 - Mar 2012
    Houston, Texas, Us
    Project: Dominion Natrium Gas Plant - Lump-sum EPFC – New Martinsville, WV- Responsible for design and requisition for a Truck loading facility consisting of 8 total automated loading skids capable of LPG export and NGL import, totaling $2.1 million USD. Requisition also included loading automation system, including two (2) truck scales and automation software. - Responsible for design and requisition of a Rail loading facility consisting of one loading platform with 10 rails loading spots for natural gasoline loading and one loading platform with 30 loading spots for LPG (Propane, Isobutane, and Normal Butane), totaling $1.6 million USD.
  • Mechanical Engineering Intern
    Meta Engineers May 2010 - Aug 2010
    Assisted in design, sizing, and drafting of mechanical systems for commercial and government buildings Designed and implemented 3D CAD models to meet firm standards in order to facilitate conversion to BIM (Building Information Modeling) software.Completed BIM modeling for 600,000 Sq. Ft. National Cancer Institute office building Permit Phase
  • Toyotomi Laser Heater Technician
    Laser Heating Service 2007 - 2009
    Presented well-articulated instructions/description of work performed to customers regarding operation of heating unit and dynamics of energy usage for customers home.
  • Laborer / Apprentice Carpenter (Part Time)
    Rcon Inc. May 2003 - Sep 2007
    Managed and organized laborers to provide logistical support of tools and supplies to help meet the deadline for the framing of a 20 duplex subdivision Worked in all phases of construction in residential and commercial projects

Nicolas Leland, P.E. Education Details

  • Clemson University
    Mechanical Engineering
  • University Of Alaska Fairbanks
    Mechanical Engineering

Frequently Asked Questions about Nicolas Leland, P.E.

What company does Nicolas Leland, P.E. work for?

Nicolas Leland, P.E. works for Burns & Mcdonnell

What is Nicolas Leland, P.E.'s role in his/her workplace?

Nicolas Leland, P.E.'s role in his/her workplace is Construction Project Manager At Burns & Mcdonnell.

What is Nicolas Leland, P.E.'s email address?

Nicolas Leland, P.E.'s email address is ni****@****ail.com

What is Nicolas Leland, P.E.'s direct phone number?

Nicolas Leland, P.E.'s direct phone number is +190737*****

What schools did Nicolas Leland, P.E. attend?

Nicolas Leland, P.E. attended Clemson University, and University Of Alaska Fairbanks .

What is Nicolas Leland, P.E.'s role in his/her workplace?

Nicolas Leland, P.E. has skills like Construction, Mechanical Engineering, Engineering, Cad, Epc, Refinery, Petrochemical, Project Engineering, Piping, Autocad, Solidworks, Energy, and Bim.

Who are the industry peers of Nicolas Leland, P.E. at other companies?

Nicolas Leland, P.E.'s peers at other companies are Matt Campbell, Robert Sanders, Mark Barzal, Brandon Hoang, Kevin Stoehr, and Brandon Whipple. and James Maldonado. Nicolas Leland, P.E.'s peers at other companies are Matt Campbell, Robert Sanders, Mark Barzal, Brandon Hoang, Kevin Stoehr, and Brandon Whipple. and James Maldonado.