Cecep Diyana

Cecep Diyana Email and Phone Number

Qc Manager @ Powertech Indonesia

Cecep Diyana's Contact Details

Cecep Diyana work email

Cecep Diyana personal email

n/a

Cecep Diyana's Current Company Details

Powertech Indonesia

Qc Manager

Cecep Diyana Work Experience Details

  • Qaqc Manager
    Powertech Indonesia ['Oct 2022', 'Present']
    Indonesia
  • Site Manager
    Supervision Construction Services Epc Project Dual Mpp Diesel Fuel Engine Generator Spread ['Jul 2018', 'Apr 2024']
    Manokwari Dan Sekitarnya, Papua Barat, Indonesia
  • Mechanical Engineer
    Sumitomo Corporation ['Jan 2018', 'Jun 2018']
    Central Java Power Plant Project (2X1000Mw)
    Central Java Power Plant Project (2X1000MW)
  • Piping Inspector
    Pt. Panca Amara Utama ['Mar 2017', 'Dec 2017']
    Luwuk Banggai, Central Sulawesi
    Banggai Amonia Plan Project
  • Qa Engineer
    Pt Basuki Pratama Engineering ['Nov 2016', 'Feb 2017']
    Jakarta
    Fabricators
  • Qhse Coordinator
    Gunnebo Indonesia Distribution ['Aug 2015', 'Sep 2016']
    Oki Pulp & Paper Mills Project, Palembang
  • Lead Qa/Qc Engineer
    Pt Prosys Bangun Persada ['Feb 2014', 'Oct 2014']
    Greater Jakarta Area, Indonesia
    Responsibility : 1.To Reviewed Client Technical Specification, Code & Standard, Drawing, Procedure, Contract Document, Scope of Work and Project Schedule.2.To Establish The Project Quality Plant (PQP) together with Project Team according to Client Specification, Applicable Code & Standard, Procedure and Work Instruction.3.To provide the related Quality Documents wich include but not limited to Welding Procedure Specification (WPS), Inspection and Test Procedure that will be used to executed the project.4.To prepared Field-Inspection and Test Plant (F-ITP) and QA/QC Procedure. 5.Requirements of following QA/QC Matters : QC Person will handle the project, Qualification requirement of QC Person, Experience of QC will be needed, Procedure will generate, QC Software needed for management reporting, QC Tools will be used, Critical item for QC and Others.6.Prepared QA/QC Structure Organization c/w Job Desc. 7.Prepared Filling and Documentation System. Make a List the below document : List of all Project Procedures c/w Numbering System, List of all Technical Specification, List of QA/QC Tools, List of Code & Standard will be used.8.To prepare, establish and implement Internal Quality Audit to success The TMS Audit and ISO 9001 : 2008 Surveillance.9.To establish Quality Training Program base on the project need : Project Quality Plant (PQP), Client Technical Specification, NCR/CPAR Procedure, Cost of Quality.Authority : 1.To stop of work if the Quality of work is not accordance with Project Quality Plant, Contract Specification and applicable Procedure or Drawing and immediately report to Construction Manager & Operational Division Head.2.To Sign of the Quality Inspection Records within the scope of work.3.To reject any unqualified worker, and material.4.To issue the Non Conformance Report to the activity which not conform to the Client Technical Specification and Code & Standard.
  • Qa/Qc (Mechanical/Piping)
    Pt Slipform Indonesia ['Jan 2011', 'Jul 2011']
    Sengkang, Wajo - Sulawesi Selatan
    Responsibility : 1.To use Standard Procedure & Design Tools for Mechanical Drawing Design and Construction.2.To Reviewed QA/QC Inspection Procedures from Mechanical/Piping from Sub Contractor.3.To Reviewed and Withness Welder Test.4.To Reviewed F-ITP Installation and Inspection Mechanical/Piping work from Sub-Contractor.5.To Reviewed WPS/PQR from Sub-Contractor.6.To monitor the process of issued recommendation, implementation and delivery material for material required.7.To prepare scope of work for special activity related to the 3rd party.8.Reviewed Turn Over Package (TOP) Mechanical/Piping work from Sub-Contractor.
  • Qa/Qc Coordinator
    Pt Envitech Perkasa - A Toshiba Group ['Jan 2010', 'Dec 2010']
    Jakarta
    Responsibility : 1.To Reviewed Client Technical Specification, Code & Standard, Drawing, Procedure, Contract Document, Scope of Work and Project Schedule.2.To Establish The Project Quality Plant (PQP) together with Project Team according to Client Specification, Applicable Code & Standard, Procedure and Work Instruction.3.To provide the related Quality Documents wich include but not limited to Welding Procedure Specification (WPS), Inspection and Test Procedure that will be used to executed the project.4.To prepared Field-Inspection and Test Plant (F-ITP) and QA/QC Procedure. 5.Requirements of following QA/QC Matters : QC Person will handle the project, Qualification requirement of QC Person, Experience of QC will be needed, Procedure will generate, QC Software needed for management reporting, QC Tools will be used, Critical item for QC and Others.6.Prepared QA/QC Structure Organization c/w Job Desc. 7.Prepared Filling and Documentation System. Make a List the below document : List of all Project Procedures c/w Numbering System, List of all Technical Specification, List of QA/QC Tools, List of Code & Standard will be used.8.To prepare, establish and implement Internal Quality Audit to success The TMS Audit and ISO 9001 : 2008 Surveillance.9.To establish Quality Training Program base on the project need : Project Quality Plant (PQP), Client Technical Specification, NCR/CPAR Procedure, Cost of Quality.Authority : 1.To stop of work if the Quality of work is not accordance with Project Quality Plant, Contract Specification and applicable Procedure or Drawing and immediately report to Construction Manager & Operational Division Head.2.To Sign of the Quality Inspection Records within the scope of work.3.To reject any unqualified worker, and material.4.To issue the Non Conformance Report to the activity which not conform to the Client Technical Specification and Code & Standard.

Cecep Diyana Education Details

  • Istn Jakarta
    Teknik Mesin 1992 - 1997
  • Institut Sains Dan Teknologi Nasional (Istn) Jakarta
    Mechanical Engineering 1992 - 1997

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.

Frequently Asked Questions about Cecep Diyana

What company does Cecep Diyana work for?

Cecep Diyana works for Powertech Indonesia

What is Cecep Diyana's role in his/her workplace?

Cecep Diyana's role in his/her workplace is Qc Manager.

What is Cecep Diyana's email address?

Cecep Diyana's email address is ce****@****o.co.id