
Abdul Muneer Email and Phone Number
Abdul Muneer Work Experience Details
-
Maintenance & Operation SuperintendentBpcl (Bharat Petroleum Corporation Limited) Kochi Refinery ['Jan 2020', 'Sep 2024']Kerala, India1. Direct the maintenance and operation activities of the assigned crafts in their area of responsibility. Audit work in the field to ensure work is being performed safely and in a timely manner. Intervening immediately in the event of breakdowns, failures, or malfunctions2. Involved in turn around shut down of the plant Crude Distillation Units, Diesel Hydro Desulphurization (DHDS) unit, Naphtha Hydro Treater (NHT)/Continuous Catalytic Regeneration(CCR) Reformer Unit, VGO Hydro Desulphurization (VGO-HDS) 3. General maintenance and servicing of static and rotating equipment and piping typically involves tasks such as inspection, testing, and corrosion protection, while rotating equipment maintenance focuses on activities like alignment, balancing, and lubrication.4. Identifying maintenance concerns and bringing it to the notice of the Plant Management promptly and then coordinating with the maintenance team and implementing corrective / preventative measures.5. Provide strong leadership and guidance to the operations team, ensuring a safe and productive work environment6. Resource loading and scheduling of plans by using computerized maintenance management system (CMMS) Maximover 7.57. Led weekly production and operations contractor meetings, facilitating stronger communication and helping to resolve critical issues.
-
Pre-Commissioning SuperintendentTecnicas Reunidas ['Dec 2017', 'Oct 2019']Kuwait1 In-charge for Testing, Mechanical Completion, Pre/Commissioning and PTO submission activities of DIESEL HYDROTREATER UNIT, NAPHTHA HYDROTREATER UNIT, KEROSENE HYDROTREATER UNIT, HEAVY OIL COOLING UNIT and INTERCONNECTING2 Monitors physical installations to ensure that work is installed in accordance with drawings, project specifications, and applicable codes. Verify close out of all system punch lists prior to hand over.3 Responsible for preservation activities. Coordinated and controlled sub-contractors preservation team for preservation activities. 4 Organizing/ conducting the system walk through with client to find out shortcoming /balance work (referred as punch) before, system handover to the client.-Establishes and chairs regular turnover and completion meetings.5 Participate in the process to approve Contractors Completion Management System (CMS), to be used as a tool to plan and report status on mechanical completion, preservation and Pre commissioning.6 Perform tasks assigned by the project commissioning Leader, related to the preparation and execution of the pre-commissioning, commissioning and startup activities. Interface with engineering disciplines, construction personnel, vendors and subcontractors.7 Performed tasks assigned related to the preparation and execution of the pre-commissioning activities. Interface with engineering disciplines, construction personnel, vendors and subcontractors.
-
Piping EngineerMadina Group ['Mar 2013', 'Oct 2013']Qatar1 Method Statement and JSA preparation for Underground/Above Ground Piping installation, Critical lift of Natural Gas Line, NDT works, Field Joint Coating, Installation of Cement Coated line, Glass Flake Coating etc.2 In-charge of piping fabrication, erection, Site Modification, Testing 3 Responsible for all Underground Piping activity (OSBL & ISBL) such as NG line, Cooling Water line supply & Return and Fire water4 Responsible for underground pipeline trench excavation, bedding, pipe lying, post padding and back filling for all UG lines which includes NG Line, Cooling Water line, Fire water line etc.
-
Turn Around SuperintendentSepl India Ltd. ['Nov 2012', 'Jan 2013']India Bpcl (Bharat Petroleum Corporation Limited) Kochi Refinery1 Provide leadership and guidance to the turnaround team and all participants during the planning and execution phases of the turnaround. 2 Work with the turnaround team to prioritize the work list, identify long delivery items, identify RV testing and equipment inspection requirements, identify specialty contractor and shop needs, develop job plans, cost estimates, LOTO/blind lists, Operations staffing plans, special job procedures, and Job Safety Analyses3 Develop a staffing and contracting plan for the turnaround which ensures the staffing of all jobs with qualified and competent personnel. Lead implementation of an SHE management plan for the turnaround.4 Responsible for equipment dismantling, cleaning (mechanical cleaning, Hydro Jetting and flushing etc.), erection, reinstatement and start-up of them5 Identify the need for and appointing of Job Representatives to oversee all pre-, during- and post-TAR scope.
-
Project EngineeerPunj Lloyd Limited ['Aug 2009', 'Oct 2012']Abudhabi, Uae (Burouge -2 (Adnoc Petrochemical, Abu Dhabi)1 Responsible for preparing Hydrostatic package, testing and flushing 2 Responsible Mechanical Completion activities and ensured that Mechanical Completion on time and efficient manner. 3 Responsible for verifying and closing out of all punch lists items.4 Provided mechanical support and manpower distribution for Pre-Commissioning and commissioning5 Responsible for temporary Fabrication shop where is fabricated temporary spools and fittings for Pre-Commissioning and Commissioning activity. 6 Planned and coordinated client involvement in Mechanical Completion activities and ensured that Mechanical Completion on time and efficient manner. 7 Responsible for verifying and closing out of all punch lists items.8 Coordinated of Pre-Commissioning/ Commissioning activities and Mechanical Support and Manpower distribution for Commissioning activities from Sub-contractors.
-
Site EngineerAl Suwaidi Industrial Services Company ['Nov 2004', 'Jul 2009']Saudi Arabia (Sadaf, Ibn Zahr, Ibn Sina, Petrochemya)SADAF (SAUDI SHELL PETROCHEMICAL COMPANY) MAINTENANCE1 Inspect facilities periodically to determine problems and necessary maintenance 2 Prepare weekly maintenance schedules and allocate work. 3 Inspect and maintain static & Rotary equipment and piping of the unit. 4 Familiar with heat exchanger dismantling, bundle removing and cleaning such as hydro jetting, mechanical cleaning, hydrostatic testing and reinstalling 5 Familiar with isolation, LOTO procedures, Confined space entry procedure, catalyst removal and reinstallation, Distillation column tray removal, repair, reinstallation etc. 6 Participated two Turnaround of MTBE, Ethyl-Benzene, Styrene unit for Column repair, tray repair, heater repair (INCONEL Alloy 625).SADAF, PETRO-KEMYA, IBN-ZAHR, IBN-SINA, SAFCO TURNAROUND1 Pre-Shut-Down systems preparation & Safety Review (PSSR) and Designing and Supervising of new spool fabrication and erection.2 Supervising and monitoring of Tray (bubble cap, valve, sieve, trays) replace and reinstatement & Loading and unloading of catalyst according to the safety material data sheet for many types of Reactors and vessels. Pressure vessel (vertical, horizontal). Responsible for Cleaning and reinstall of Heat exchangers with its all types Shell and tube, Plate & Compact (fixed tube, floating head, u-tube, and kettle....etc.). Responsible for dismantling (for cleaning and repair purpose) and reinstatement of equipment and piping spool3 Lead daily progress meetings during TA execution period and Set clear performance measurement standards against all aspects of the turnaround.4 Assist unit superintendents in setting and approval of job list shutdown objectives, scope of work and scheduling of all related tasks5 Carry out risk assessments on high risk and critical path elements of the work scope6 Liaise with materials department to ensure spare parts and outside services are in place on time.
-
Piping SupervisorTech-Sharp (P) Ltd. ['May 2000', 'May 2001']Surat, Gujarat, IndiaResponsible of Hydro & Pneumatic tests and Pre-Commissioning activities (Air Blowing, Water Flushing etc).Day to day planning of work & daily progress determination.
Abdul Muneer Education Details
-
Anna University ChennaiA 1996 - 2000
-
Annamalai UniversityHuman Resource Management 2010 - 2012
-
Anna UniversityA 2001 - 2003
Other Similar Profiles
-
Ratesh Valia Veedu
Dubai, United Arab Emirates
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trialFrequently Asked Questions about Abdul Muneer
What is Abdul Muneer's role in his/her workplace?
Abdul Muneer's role in his/her workplace is 20+ Years Of Extensive Experience In Oil & Gas Industry, Looking For New Job!.
What schools did Abdul Muneer attend?
Abdul Muneer attended Anna University Chennai, Annamalai University, and Anna University .
What is Abdul Muneer's role in his/her workplace?
Abdul Muneer has skills like Piping, Epc, Construction, Engineering, Refinery, Inspection, Pipelines, P&id, Autocad, Pumps, Primavera P6, Project Estimation, Construction Management, Project Control, Asme, Steel, Power Plants, Equipment Commissioning, Subcontracting, Quantity Surveying, Commissioning, Project Engineering, Petrochemical, Petroleum, Metal Fabrication, and Oil And Gas.
Who are the industry peers of Abdul Muneer at other companies?
Abdul Muneer's peers at other companies are Praveen Anumukonda, Satyapalsinh B Zala, Somsubhra Roy, Arun Kumar Balan Pillai, Abdul Matheen Mohammed, and Ratesh Valia Veedu. and Parthiban Rajangam. Abdul Muneer's peers at other companies are Praveen Anumukonda, Satyapalsinh B Zala, Somsubhra Roy, Arun Kumar Balan Pillai, Abdul Matheen Mohammed, and Ratesh Valia Veedu. and Parthiban Rajangam.